What I really want to be able to do on this layout is to empty the contents of a skip into the back of a truck. A long search, accompanied by helpful advice on the NGRMOnline forum, has sourced some good ideas for suitable builders lorries to receive a load. However, one particular manufacturer is quoting 2 months delivery on an item, While another would appear to be reticent about delivering to the USA. (To be honest, I don’t blame them. The transatlantic mail service is not what it used to be.) So, I’m giving consideration to making a bin to tip into, while I wait for a lorry to arrive from wherever it may be.
From the outset I’ve been considering the concept of tipping different grades of sands or gravels into different bins. I thought perhaps three at the start, now I think only two different grades would be needed. To that end, I started to mock up the size of bin that would be needed. I’ve no idea how this feature would translate into 16mm scale so mock ups are a must.
|
Mocking up the bin |
As you can see, once you add the Land Rover and a bin, the area starts to fill up. I think I could only get away with the one bin on the layout. A few millimeters here and there in the size of the bin are going to make all the difference. Proportions of height to width, are important. If you make it too tall and thin it’s going to look flimsy and like the walls could collapse under the weight of sand. Too short and fat and the sand or gravel will spill out of the bin as the amount tipped into the bin increases.
How much gravel/sand will a bin hold? How much spillage outside the bin will there be?
A mock up and test is needed.
|
The bin holds a lot of sand/gravel |
|
Successful tipping experiments |
What this tells me is that despite the long drop there is no overspill. Perhaps as the bin fills up the chance of material ending up outside the receptacle would increase but right now I’ve emptied 6 skip loads into this bin and there’s no overspill. I’ve also run out of fine buff ballast so I can’t add more. I think that’s a success.
I’ll add a handle to the back of the bin so I can easily slide it rearwards off the layout to be emptied or perhaps even change it out with a lorry when it is full. All in all, a successful days work.
No comments:
Post a Comment